This was a newly built dealership with an opening set for April 2015
Darlington’s took just one week to undertake the works 4500m2 of car parks.
Laying base and surface course and then finally applying the thermoplastic line markings ready for the showroom opening.
Works: To plane off the existing surface of 3no large areas and reinstate.
Works commence on sit at 7.00am with the planer removing the existing surface and arranging for disposal off site.
The areas were swept clean and tack coat applied.
Tarmacadam delivered to site approx 9.30am and areas reinstated.
By 4.00pm the track was reopened and the first race meeting held 4.30pm.
The works where undertaken in one day
Darlington Tarmacadam were asked to complete an extensive project in Salford, Manchester. The job involved extensive tarmacing of a road and drive for a new commercial office complex close to the City centre. Our experienced team worked over a few days to complete the project to our usual high standards.
In December 2014, Darlington Tarmacadam were called into the Premier Inn Liverpool to look at their main car park which was in a poor condition with potholes, no line marking and general disrepair after many years of use. Our team of experienced workmen, arrived in the morning, tarmacing the car park and then our team lined the car park with car park spaces and disabled car park spaces. Please see the images below, which show the car park before we started and during the day and completion of the project.
Darlington Tarmacadam have recently completed working at the historical Samlesbury Hall, a stunning stately home in the heart of Lancashire. We were called in to resurface the car park and driveway of this magical Hall.
The images below show the car park and drive before we started work and what was carried out by our experienced team of workmen.